AGL's virtual power plant: what you get, what AGL can use, and who can join
AGL runs one of Australia's biggest virtual power plants. Here is what it pays a battery owner, how much of your battery it can use, and the conditions.
AGL's VPP pays $80 a year in bill credits ($20 a quarter), plus $1 for every kWh your battery charges from or discharges to the grid during VPP events. AGL caps event use at 250kWh a year and never discharges your battery below 20%. You need an AGL electricity plan, a compatible battery and inverter, a smart meter, and a fixed export limit of at least 5kW.
What you get
AGL pays a flat $80 a year in bill credits, or $20 a quarter, plus $1 for every kWh your battery charges from or discharges to the grid during VPP events[1]. It will not use more than 250kWh a year of your battery in events[1], so the event credit tops out around $250.
What AGL can do with your battery
AGL says it will never discharge your battery below 20% capacity[1]. It also offers a bill-impact guarantee: VPP participation may cause small bill increases, but never more than $50 a year[1].
Who can join
- An AGL electricity plan, and you must stay on one[1].
- A battery and inverter on AGL's compatible list, which covers brands including Alpha ESS, GoodWe, Tesla Powerwall 2 and 3, Sungrow and Sigenergy, by model[1].
- A fixed export limit of at least 5kW at your address; under 5kW you are not eligible[1].
- A smart meter, a battery that passes AGL's initial test, and no other VPP[1].
Buying the battery through AGL
AGL offers a $1,000 discount on a battery bought through it if you stay in the VPP for five years; leave early and you may have to repay part of it[1].
Before you sign
VPP terms change often. These are the retailer's published terms as we read them on 13 November 2026; check the current terms before you sign, and compare the whole plan, not just the VPP credit.
Get your own numbers
Two minutes of questions gets you your system size, what it should cost after rebates in your state, and what it saves, built on your roof and your usage. No installer sees anything unless you ask.
Run my numbers, freeNo installer buys placement or ranking here, and nothing reaches an installer unless you ask.
Common questions
How much does AGL's VPP pay?
$80 a year in bill credits plus $1 per kWh your battery charges or discharges during VPP events, with event use capped at 250kWh a year.
Can AGL drain my battery?
AGL says it will never discharge your battery below 20% capacity.
Can I join AGL's VPP with a 1.5kW export limit?
No. AGL requires a fixed export limit of at least 5kW at the address.