Victoria's two-way solar tariffs from 2026: what each network charges and pays
Every Victorian electricity network now has an approved two-way solar tariff for 2026 to 2031. They are opt-in, and they all start from the same free allowance. Here is how they compare.
Victoria's five networks all have opt-in two-way solar tariffs for 2026 to 2031, with the same free allowance of 1kWh a day of exports in the solar soak window. CitiPower, Powercor and United Energy charge 1c a kWh above it from September to May, and pay a 7c reward in summer and winter evenings. Jemena's revised proposal charges 2.9c and pays 14.7c. The Victorian Government has effectively ruled out putting customers on an export charge without their choice.
What is the same everywhere
All five networks proposed residential opt-in two-way tariffs with the same basic export level of 1kWh a day, and the regulator noted the consistency of that level and the solar soak windows[1]. AusNet's tariff makes exports between 11am and 4pm free up to that 1kWh a day, charges above it in that window, and pays a reward between 4pm and 9pm[2]. The tariffs are opt-in; the Victorian Government has effectively stopped customers being assigned to an export charge against their choice[2].
CitiPower, Powercor and United Energy
The regulator approved their two-way tariffs in April 2026[1]. The export charge is 1c a kWh, applied only from September to May, and the export reward is 7c a kWh, only in December to February and June to August[1]. The regulator required the three networks to measure the free 1kWh a day over a 31-day period, so unused allowance carries across days in a billing period[1].
Jemena
The regulator approved Jemena's two-way tariff in its April 2026 final decision[1]. Jemena's revised proposal was an export charge of 2.9c a kWh from 11am to 4pm and an export reward of 14.7c a kWh from 4pm to 9pm[1], higher on both counts than the other networks.
AusNet
AusNet's tariff uses the same 1kWh a day free level, an 11am to 4pm charge window and a 4pm to 9pm reward[2]. The regulator noted AusNet significantly increased its indicative export reward in its revised tariffs[2]. We could not find AusNet's final 2026-27 rates, so check them with your retailer.
Should you opt in?
It suits a household with a battery that can export in the evening, because the evening rewards are the point. It suits a home that exports a lot at midday less. In Victoria this site's calculator uses about 1c a unit for exports against about 30c for power you buy[3], so storing and using your own power still beats exporting it either way. Ask your retailer whether a plan built on the two-way tariff is available and what it pays.
Get your own numbers
Two minutes of questions gets you your system size, what it should cost after rebates in your state, and what it saves, built on your roof and your usage. No installer sees anything unless you ask.
Run my numbers, freeNo installer buys placement or ranking here, and nothing reaches an installer unless you ask.
Common questions
Are Victorian solar export charges compulsory?
No. The two-way tariffs are opt-in, and the Victorian Government has effectively stopped customers being assigned to an export charge against their choice.
How much is the free export allowance in Victoria?
1kWh a day of exports in the solar soak window, the same on all five networks.
Which Victorian network pays the most for evening exports?
Jemena's revised proposal pays 14.7c a kWh from 4pm to 9pm. CitiPower, Powercor and United Energy pay 7c a kWh in summer and winter evenings.
Sources
- Australian Energy Regulator, Final decisions for the Victorian networks, 2026-31 (April 2026), with the September 2025 draft decisions. Read 2026-11-13. (read through a search engine's copy of the page)
- Australian Energy Regulator, Tariff structure statement, final decision, AusNet Services 2026-31 (April 2026), and AusNet's tariff documents. Read 2026-11-13. (read through a search engine's copy of the page)
- Aussie Solar Info calculator (how it works), installed battery ranges and rebates as of 2026-11-13.