Is 99.9kW still the sweet spot for business solar?
For years, commercial quotes clustered at 99.9kW, because one kilowatt more lost the whole upfront certificate discount. That reason no longer exists.
Not for the old reason. Since 1 October 2026, systems above 100kW and up to 1MW can create STCs too, so 100kW is no longer a cliff. What now decides the size is your daytime load, your roof, your network's connection rules (30kW and 200kVA are common thresholds) and, in Victoria, the VEU discount band of 30 to 200kW.
Why 99.9kW was the sweet spot
Before 1 October 2026, systems over 100kW could only earn large-scale generation certificates over time, not the upfront STC discount[2]. So a 99.9kW system got a large upfront discount and a 100.1kW system got none, and quotes bunched just under the line.
What changed
Systems above 100kW and up to 1MW installed from 1 October 2026 can create STCs, with a fixed 5-year deeming period[1]. A 150kW system in Zone 3 now earns about 1,036 STCs[3], where it used to earn none upfront.
The thresholds that still matter
- 30kW: above it, systems need written network approval and central grid protection. See connecting over 30kW.
- 200kVA on Ausgrid: sites from 30 to 200kVA can choose a cheaper application by limiting exports to 30kW. See Ausgrid's options.
- 30 to 200kW in Victoria: the band for the VEU business solar discount. See Victoria's VEU discount.
- 1MW: the top of the mid-scale STC band, counting related capacity on the site.
So what size?
Size to the daytime load, not the certificate. A system that exports most of its output earns little for it, especially on networks with export limits. The interval data in your bills shows how much you use while the sun is up: see what to send for an assessment.
Get your business site assessed, by email
Commercial solar depends on your roof, your tariff, your load profile and your network, so every site is looked at individually. There is no online calculator for this, on purpose.
- 12 months of electricity bills, or your smart meter interval data (NEM12)
- The site address and what the business does
- Roof type and a few photos, if you have them
Or email olly@aussiesolarinfo.com with the subject "Commercial solar enquiry".
No installer pays to appear on this site. Nothing reaches an installer unless you ask.
Common questions
Should a business solar system still be 99.9kW?
Not because of STCs. Since 1 October 2026, systems up to 1MW can create STCs, so size to your load, roof and network rules instead.
Do systems over 100kW get the STC discount now?
Yes, for systems above 100kW and up to 1MW installed from 1 October 2026.
Sources
- Clean Energy Regulator, Mid-scale solar. Read 2026-11-15. (read through a search engine's copy of the page)
- Minister for Climate Change and Energy, Putting more roofs to work. Read 2026-11-15. (read through a search engine's copy of the page)
- Clean Energy Regulator postcode zone ratings (Zone 1 1.622, Zone 2 1.536, Zone 3 1.382, Zone 4 1.185 MWh per kW), as carried in this site's calculator (how it works).